Route survey, duct/trench planning, pulling/blowing and joint-location control Splicing, ODF termination, labelling and power-meter/OTDR testing Test packs, core allocation, route drawings and as-built documentation
Every engagement starts with a site survey — no obligation.
We usually reply within one business day. No spam, ever.